Museum of London Essential Works
KEY STATISTICS • Works included decorations to external and internal public/communal areas • External building fabric repairs • Work carried…

KEY STATISTICS
• 3-year plumbing contract (extendable 1 year)
• Leak detection + repair specialist services
• Emergency plumbing response systems
• Essential infrastructure for landmarks area
Site: Artillery House
Client: Metrus
Site operatives: Manned site
Project: Refurbishment of the lobby, CAT A contract.
An icon of Historic England, grade II listed building, built in 1928, in modernistic “Hollywood Egyptian” style, with architectural detailssuch as doorways surmounted by a ceramic miniature howitzer, appropriate to teh building’s name, with strip windows lightning stairs above, and more, kept the spirit of the past and became one of the most wanted office blocks.
Office Lighting Specification:
The project is set over 650SqM across a 4 month timeframe.

Get in touch today to schedule a site survey or request a tailored maintenance proposal.
Call 020 7481 0222 or email info@polyteck.co.uk.