Grove Vale
KEY STATISTICS • 20 New Apartments • 7,000 sq ft Commercial • Specification: Lifetime Homes Code 4 • Polyteck +…

KEY STATISTICS
• 8 New Flats
• Specification: Steel Frame Mansard
• Specification: Tenanted Build
Client: Anderson Wilde and Harris
Project: Balham Hill
Duration: 35 weeks
A full design and build package to build 8 flats over the top of an existing structure, which was also a grade 2 listed building. This was to be completed with the tenants in occupation.
The works involved the removal of the existing roof covering and the construction of a new steel frame structure above the existing building. Construction of a new mansard roof and the internal fit out of 8 flats was also included. Completion scheduled for May 2016.

Get in touch today to schedule a site survey or request a tailored maintenance proposal.
Call 020 7481 0222 or email info@polyteck.co.uk.