Skip to content
Balham Hill | Polyteck Case Study

KEY STATISTICS

• 8 New Flats
• Specification: Steel Frame Mansard
• Specification: Tenanted Build

BALHAM HILL

Client: Anderson Wilde and Harris
Project: Balham Hill
Duration: 35 weeks


A full design and build package to build 8 flats over the top of an existing structure, which was also a grade 2 listed building. This was to be completed with the tenants in occupation.

The works involved the removal of the existing roof covering and the construction of a new steel frame structure above the existing building. Construction of a new mansard roof and the internal fit out of 8 flats was also included. Completion scheduled for May 2016.

Balham Hill | Polyteck Case Study

Get in touch today to schedule a site survey or request a tailored maintenance proposal.
Call 020 7481 0222 or email info@polyteck.co.uk.

Back To Top